Author: Heinrich Grümmer
-

Planking the Hull
Today the first half of the hull mold got planked using about 60 of the basswood strips we cut earlier. It seems like we have cut just enough to finish the other half and the inner deck. It took another full day to complete the planking and create epoxy fillets on the inside that hold everything…
-

CNC Milling of Mold Sections and Keel
Finally getting started with the actual building process… it was nice to see the design we have been working on for such a long time turning into something real!
-

Optimization Finished
An optimization of the hulls stability and self righting ability was carried out using CAESES. The goal was to improve upright stability and maximum righting arm of the hull while keeping it’s self righting ability. 2100 different designs were evaluated using an algorithm to find the one suiting our needs best. More detailed information on the process…
-

Prototype Thruster Arrived
Just picked up our ducted propeller at the customs. It is a T100 made by Blue Robotics and will serve us as a temporary propulsion system to test all of our hardware and get the autopilot and gps tracking running. Later on we are planning to design our own propulsion unit wich shall be less prone to getting…